Section 3: Interim Project Review Guide – State and Federal-Aid Projects
All projects are to be inspected/reviewed on a regular basis to ensure compliance with the contract requirements and that the work is performed according to the plans and specifications. District offices should document their project record reviews for project records compliance at 30%/60%/90% completion (based on project dollar values). Table 1 lists some of the basic compliance categories and the required standard for acceptance.
Item |
Standards |
|
---|---|---|
Contractor bulletin board |
|
|
Traffic Control Plan (TCP)/Barricades |
|
|
Construction Items |
|
|
Inspection |
|
|
Materials |
|
|
Progress |
|
|
Storm Water Pollution Prevention Plan (SW3P) (coordinate with DEQC) |
|
|
DBE (coordinate with district DBE coordinator) |
|
|
AO and DCO audits |
|