Section 6: Surplus Materials
The contractor will take ownership of surplus materials unless otherwise shown on the plans or directed. Remove, transport, and dispose of materials in accordance with federal, state, and local environmental regulations. If requested by the Engineer, the contractor must provide an appropriate level of documentation to verify proper transport and disposal.